57 minutes ago
Showing posts with label drilling rig. Show all posts
Showing posts with label drilling rig. Show all posts
Thursday, September 9, 2010
VT Academic and Student Affairs Building - Foundation Observations
The new Academic and Student Affairs Building at Virginia Tech is under construction just a short walk from the Department of Building Construction. What a great opportunity to observe the construction process from ground breaking onward. The finished building will include 77,301 finished square feet in 3 stories and will house two floors of dining and one floor of classroom space at a cost of just over $45,000,000. The schematic photos of the building show a green roof and rain gardens, leading me to the conclusion that cutting edge green technology was an integral part of the design process. Although construction is scheduled to take until summer 2012, I will be chronicling some of the important milestones as the foundations are constructed through December 2010.
Subscribe to:
Posts (Atom)

